Services
Basic Maintenance Contract
each visit includes;1. measurement of sludge levels.2. cleaning of filters (excluding biokinetic, and sand)3. testing of pumps, aerator, system alarm, floats, timers, and dispersal field (spray/drip).4. running amps of pumps and aerators5. ph, and chlorine residual6. yearly replacement of; aerator filter7. replaced as needed; A. diffuser C. alarm bulbs B. panel
Price list of services, parts and labor, not included with this contract.
1.control panel $600.00 9.mute test switch $60.002.effluent pump $600.00 10.buzzer $50.003.aerator $400.00 11.relay $40.004.control box $200.00 12.pressure sensor $40.005.wire(30'6) $200.00 13.air line(30'x3/4') $45.006.dosing timer $130.00 14.conduit(30'x3/4') $40.007.floats $90.00 15.terminal block $25.008.spray timer $60.00 16.pressure tubing $5.00
everything else = materials x 1.75
Preventive Maintenance Contract
each visit includes:
1. measurement of sludge levels.2. cleaning of filters (excluding biokinetic, and sand)3. testing of pumps, aerator, system alarm, floats, timers, and dispersal field (spray/drip).4. running amps of pumps and aerators5.ph, and chlorine residual6. yearly replacement of; A. aerator filter B. aerator diaphragm7. replaced as needed; A. diffuser E. mute test switch B. panel breakers F. pressure tubing C. alarm bulbs G. ant bait D. alarm buzzer Price list of services, parts and labor, not included with this contract.
1.control panel $450.00 7.floats $70.002.effluent pump $400.00 8.spray timer $40.00 3.aerator $300.00 9.relay $10.004.control box $100.00 10.pressure sensor $10.005.wire(30'6) $100.00 11.air line(30'x3/4') $30.006.dosing timer $100.00 12.conduit(30'x3/4') $25.00 everything else = materials x 1.5
1.control panel $450.00 7.floats $70.002.effluent pump $400.00 8.spray timer $40.00 3.aerator $300.00 9.relay $10.004.control box $100.00 10.pressure sensor $10.005.wire(30'6) $100.00 11.air line(30'x3/4') $30.006.dosing timer $100.00 12.conduit(30'x3/4') $25.00 everything else = materials x 1.5
Warranty Maintenance Contract
each visit includes;
1. measurement of sludge levels.2. cleaning of filters (excluding biokinetic, and sand)3. testing of pumps, aerator, system alarm, floats, timers, and dispersal field (spray/drip).4. running amps of pumps and aerators5. ph, and chlorine residual6. replacement of effluent pump every three years7. yearly replacement of; A. aerator filter B. aerator diaphragm8. replaced as needed; A. diffuser J. control box B. panel breakers K. wire(30'6) C. alarm bulbs L. dosing timer D. alarm buzzer M. spray timer E. mute test switch N. relay F. pressure tubing O. pressure sensor G. ant bait P. air line H. effluent pump Q. conduit I. aerator everything else = materials x 1
1. measurement of sludge levels.2. cleaning of filters (excluding biokinetic, and sand)3. testing of pumps, aerator, system alarm, floats, timers, and dispersal field (spray/drip).4. running amps of pumps and aerators5. ph, and chlorine residual6. replacement of effluent pump every three years7. yearly replacement of; A. aerator filter B. aerator diaphragm8. replaced as needed; A. diffuser J. control box B. panel breakers K. wire(30'6) C. alarm bulbs L. dosing timer D. alarm buzzer M. spray timer E. mute test switch N. relay F. pressure tubing O. pressure sensor G. ant bait P. air line H. effluent pump Q. conduit I. aerator everything else = materials x 1